首页> 外文会议>International Conference on Industrial Engineering, Management Science and Application >A Simultaneous Integrated Model With Multiobjective For Continuous Berth Allocation And Quay Crane Scheduling Problem
【24h】

A Simultaneous Integrated Model With Multiobjective For Continuous Berth Allocation And Quay Crane Scheduling Problem

机译:一种同时集成模型,具有多目标的连续泊位分配与码头起重机调度问题

获取原文

摘要

This paper presents the simultaneous integration model of berth allocation and quay crane scheduling. Berths and quay cranes are both critical resources in port container terminals. The mathematical model uses a mixed integer linear programming with multiple objectives generated by considering various practical constraints. Small data instances have been taken to validate the integrated model. A numerical experiment was conducted by using LINGO programming software to evaluate the performance and to obtain the exact solution of the suggested model.
机译:本文介绍了泊位分配和码头起重机调度的同时集成模型。泊位和码头起重机都是端口集装箱码头的关键资源。数学模型使用混合整数线性编程,通过考虑各种实际限制而产生的多个目标。已经采取了小数据实例来验证集成模型。通过使用Lingo编程软件进行数值实验来评估性能并获得所提出的模型的精确解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号