首页> 外国专利> Quay crane system and operation process after upgrading and remodeling

Quay crane system and operation process after upgrading and remodeling

机译:升级和重塑后码头起重机系统和操作过程

摘要

In the quay crane system and operation process after upgrading and remodeling, the traditional quay crane girder is converted into two trapezoidal four-track girder (1), and the upper trolley ( 2) runs, and the low trolley (3) is hooked upside down on the outer low trolley running track (a8) on the 2 trapezoidal 4-track girder (1), while the upper trolley (2) holds the container (5) through the sling (4). Lift it so that it can pass through the low trolley (3). The quay crane system is based on one working trolley of the traditional quay crane, and one working trolley is added to the outside of the existing quay crane girder. , the two trolleys work independently, without interfering with each other; The two trolleys of the quay wall crane after the renovation intersect and pass spatially, overlapping in time, so that the unloading efficiency is doubled.
机译:在Quay起重机系统和操作过程升级和改造后,传统的Quay起重机梁被转换成两个梯形四轨梁(1),上小手(2)运行,低手推车(3)被钩住 在2梯形4轨道梁(1)上的外低推车运行轨道(A8)上,而上推车(2)通过吊索(4)保持容器(5)。 抬起它,以便通过低手(3)。 Quay起重机系统基于传统码头起重机的一个工作台车,并且一个工作台上的手推车被添加到现有码头起重机梁的外部。 ,两只手推车独立工作,没有干扰彼此; 翻新后码头壁起重机的两个手推车相交并在空间上传递,在时间重叠,使卸载效率加倍。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号