CONSTRUCTION AND IMPROVEMENT METHOD FOR THE BERTH SCHEDULING IN THE CONTINUOUS BERTH

机译:连续泊位中泊位调度的构造和改进方法

摘要

PURPOSE: A construction and improvement method for berth scheduling in a continuous berth is provided to determine the optimal position and time for come alongside the pier. CONSTITUTION: An initial assignment order for ships is determined(S100). The ships are arranged one by one according to the initial assignment order so that an initial ship arrangement table is created(S200). The ship arrangement table is improved based on the initial ship arrangement table(S300). A container crane is additionally assigned to each ship based on the final ship arrangement table(S400). The initial assignment order is determined based on SPT(Shortest Processing Time) regulation, EDD(Earliest Due Date) regulation and SBC(Sequence By Cost) regulations.
机译:目的:提供一种在连续泊位中泊位调度的构建和改进方法,以确定与码头并排的最佳位置和时间。宪法:确定船舶的初始分配顺序(S100)。根据初始分配顺序逐一布置船,从而创建初始船布置表(S200)。在初始船安排表的基础上改进船安排表(S300)。根据最终船舶布置表将集装箱起重机另外分配给每艘船(S400)。初始分配顺序是根据SPT(最短处理时间)规定,EDD(最早到期日期)规定和SBC(按成本顺序)规定确定的。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号