【24h】

Breach Forming Scenarios at Concrete Faced Rock-fill Dams

机译:混凝土面向岩石填充水坝的违规成型情景

获取原文

摘要

Rock-filled dams with reinforced concrete facing,as the proposed study case of Bolboci Dam on the River lalomita,Dambovita County,centre Romania,are characterized by a very high operation safety.On the international level,there is no record of failed concrete faced rock-fill dams.However,during their usage there have been several incidents mainly due to the unsatisfactory behaviour of the reinforced concrete masks.Specifically,in an ICOLD statistic that presented 17 cases of damages to rock-fill dams with reinforced concrete facing,14 were due to the unsatisfactory behaviour of the reinforced mask.The other 3 cases were due to piping phenomena or percolation through the dam foundation or the lake's shore.The failure scenarios of this dam type,Bolboci Dam including,can be as follows: the retaining structure over-spilling during floods due to an insufficient or poor operation of top and/or bottom dischargers-the overflow gradually erodes the body of the dam until the breach occurs;concentrated infiltrations with a high gradient through the dam body as a result of a serious malfunction in the concrete facing sealing,with material carving in,leading to breaches in the dam body;piping in the dam foundation/side banks that could finally lead to slippage and finally dam failure(improbable due to the existing geotechnical conditions);overpassing the safety guard of the dam's crown leading to the dam over-discharging as a result of irreversible excessive subsidence due to exceptional incidents.There have been studies on three statistical methods on how characteristical breaches occur: MLM Empirical Method,Washington State and Froehlich.The Froehlich method has been endorsed and modified,because Bolboci Dam is a well built,well executed and a well employed dam.The failure hypotheses of the dam were done with applications using MathCAD software,their algorithm being based on the finite differences method.It must be specified that the statistical approach of dam failure is a trap,due to the fact that it is well know they are a work of one of a kind engineering art.This fact shows the difficulty of the elaboration of the failure scenarios and the need of a sensitivity study for the comparison of the scenarios.The results show that the failure of rock-filled dams with reinforced concrete facing is highly improbable and leads to small flows with a sluggish evolution of the breaches.
机译:具有钢筋混凝土面向钢筋的水坝,作为罗伯科河上的博尔博会大坝的研究案例,罗马尼亚州达尔马蒂塔县,以非常高的运营安全为特色。国际一级,没有故障混凝土的记录面临岩石填充水坝。在他们使用期间,有几个事件主要是由于钢筋混凝土掩模的行为令人难以置上的行为。在冰块统计中表现出17个岩石填充水坝造成的17个案件,14由于增强面膜的行为不满意。其他3例是由于管道现象或通过大坝基金会或湖泊的岸边的渗滤。这种大坝型的失败情景包括如下:保留由于顶部和/或底部放电器的操作不足或差的洪水期间结构过度溢出 - 溢流逐渐侵蚀大坝的主体直到突破;浓缩由于混凝土的严重故障,通过坝体的严重故障,具有高梯度的渗透,其雕刻雕刻,导致坝体中的漏洞;管道在大坝基础/侧面银行,最终可能导致滑动最后的坝体失败(由于现有的岩土工程而不可能);由于由于特殊事件而不可逆转过度的沉降,大坝冠的安全防护导致大坝过度放电。有三种统计方法研究了三种统计方法如何发生特性泄露:MLM经验方法,华盛顿州和弗洛里奇。弗罗布里奇的方法已被认可和修改,因为博博大坝是一个良好的建造,实用良好的水坝。用应用程序完成了大坝的故障假设Mathcad软件,它们的算法基于有限差异方法。必须指定坝故障的统计方法是TR AP,由于它很好地知道它们是一种善意的工艺品的工作。这一事实表明了难以制定失败情景以及对情景比较的敏感性研究的需要。结果表明,钢筋混凝土面向岩石填充坝体的失效是非常不可能的,导致小流动突破缓慢的进化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号