Evaluating the Need to Use Integrated Project Delivery (IPD) Approach as a New Alternative Implementation System in Developing Countries

机译:评估使用综合项目交付(IPD)方法作为发展中国家的新替代实施系统

获取原文

摘要

The progress achieved through social and economic development in today's world, results in expanding activities in the field of engineering projects [1]. One of the factors of economic development in each country is success of its civil infrastructure projects [2]. In recent years, the government of Iran has welcomed using technology in the civil and infrastructure section, in order to develop the country and create economic boom [3]. Considering the increase of complexities in the building industry, it is faced with several challenges. The building industry has learned many ways to face these challenges through offering diverse systems for project implementation. Moreover, due to the increasing need of societies and more importance of time, cost, and quality in evaluating the projects, systems of project implementation need presenting new approaches [1]. For this purpose, a number of practitioners in this industry have proposed a new delivery system under the title of Integrated Project Delivery (IPD). IPD is the result of changes of the traditional project delivery models which gathers all the project team members at an early planning and design time in order to reduce time, avoid wastes, improve project performance, and to create a win-win result for all those involved in the project (Glick and Acree Guggemos, n.d.). This approach improves project objectives through a participatory system [26]. It optimizes project implementation system by enhancing cooperation among different project stakeholders [4]. In fact, increasing coordination and participation of members of project team are considered as the major IPD target [5]. Studies have shown that IPD can be used in all kinds of projects, but as it is not used widely, it is supposed that it is not still approved in Iran as a developing country; whereas this approach has been used in many projects abroad [6]. In this study, due to incompatibility and inability of the common civil contracts in Iran in using the experiences of other stakeholders and inappropriate distribution of profit and loss among them, duplications and other similar problems in them, IPD has been introduced as a new system for conducting the civil projects and a response to most of these problems. According to lack of understanding of IPD in Iran and other similar developing countries and consequently using previous traditional approached, it is required to introduce this approach as a new approach in implementing the civil projects.
机译:通过当今世界的社会和经济发展实现的进展,导致在工程项目领域扩大活动[1]。每个国家的经济发展因素之一是其民事基础设施项目的成功[2]。近年来,伊朗政府欢迎在民事和基础设施部分中使用技术,以发展国家并创造经济繁荣[3]。考虑到建筑业复杂性的增加,它面临着几个挑战。建筑业通过为项目实施提供多样化的系统来了解了很多方法来面临这些挑战。此外,由于社会需求的越来越多,更重要的时间,成本和质量在评估项目方面,项目实施系统需要呈现新方法[1]。为此目的,该行业的许多从业者提出了综合项目交付标题(IPD)的新交付系统。 IPD是传统项目交付模型的变化的结果,在早期规划和设计时间内收集所有项目团队成员,以减少时间,避免废物,提高项目绩效,并为所有这些创造双赢的结果参与项目(Glick和AcreeGugemos,ND)。这种方法通过参与式系统提高了项目目标[26]。它通过加强不同项目利益相关者的合作优化项目实施系统[4]。事实上,提高项目团队成员的协调和参与被视为主要的IPD目标[5]。研究表明,IPD可以在各种项目中使用,但由于它不广泛使用,因此应该在伊朗作为发展中国家仍未批准;而这种方法已被用于国外的许多项目[6]。在本研究中,由于伊朗的普遍民事合约的不相容性和无法使用其他利益攸关方的经验以及它们之间的不恰当分配,他们的重复和其他类似问题,IPD被引入为新系统进行民事项目和对大多数这些问题的回应。根据伊朗和其他类似发展中国家的IPD缺乏了解,因此使用以前的传统方式,需要将这种方法引入实施民事项目的新方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号