TBM Tunnelling under Difficult Conditions: Too Massive, Too Faulted, Too Wet, Too Deep

机译:TBM隧道在困难的条件下:太大了,过错了,太湿了,太深了

获取原文

摘要

It is common knowledge that TBM are remarkable machines. It nevertheless takes mental effort to accept that they can have world record 1 day, 1 week and 1 month tunnel advance as high as 172m, 703m and 2163m. However, the best monthly project averages for the usually smaller 3m to 6m diameter machines which have delivered these incredible records are ‘only’ 1.1 to 1.3 km, not anywhere near 2km. In other words, tunnel length and time take a toll, due both to geology, hydrogeology, and machine-related delays. Unfortu-nately, the other side of the coin has seen more than a few TBM that remain buried in mountains forever (need-ing drill-and-blast completion), or they are delayed for many months or even years. This huge range of perfor-mance demands a lot from models of TBM prognosis: the range of tunnel advance may vary over four orders of magnitude from 0.001m/hr (i.e. stuck in fault zone) to an occasional 10m/hr penetration rate. Because of the huge range of an empirical parameter QTBM, this range is possible to encompass, and is founded on the 0.001-1000 Q-value range, plus particular emphasis on comparing cutter thrust and rock mass strength, 1 to 100MPa.
机译:很常识,即TBM是非凡的机器。然而,仍然需要精神努力,接受他们可以拥有世界纪录,1周和1个月隧道高达172米,703米和2163米。但是,通常较小的3米到6米到6米直径的最佳月度项目平均值,这些机器已经令人难以置信的记录“仅为”只“1.1至1.3公里,而不是2km附近的任何地方。换句话说,由于地质,水文地质和与机器有关的延迟,隧道长度和时间造成损失。不幸的是,硬币的另一边已经看过超过几个TBM,它永远埋在山上(需要钻头爆炸完成),或者它们被推迟了很多月甚至几年。这种巨大的穿孔漫步要求从TBM预后的模型中需要很多:隧道前进的范围可能在0.001M / HR(即断层区域)到偶尔的10M / HR渗透率的四个数量级。由于QTBM的实证参数巨大范围,该范围是可以涵盖的,并且在0.001-1000 Q值范围内,并特别强调比较切割器推力和岩体质量强度,1至100MPa。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号