The current development of Tunu field level has reached a mature level. Finding target for new wells with adequate reserves to pass the economic cut-off limit has been a challenging task. In addition, with the recent low gas price environment, completing these marginal wells using currently proven Gravel Pack (GP) well design makes these wells uneconomical. Answering the challenge, and with alignment to cost culture program, Total E&P Indonesie launched a collaborative project aiming for cost-effective wells against well reserves. Shallow Light Architecture (SLA) well design was introduced as the outcome of well architecture simplification process. For sand control, a successful period of trials of chemically-enhanced sand consolidation has boosted the confidence to implement sand consolidation on the industrialization phase as primary sand control in SLA wells. This paper aims to describe a brief development of the technology, implementation, and results for the operator.
展开▼
机译:Tunu Field Leve的当前发展已达到成熟水平。通过充足的储备来发现新井的目标是经济截止限制一直是一个具有挑战性的任务。此外,随着近期低气体价格环境,使用目前经过验证的碎石包(GP)井设计完成这些边际井,使这些井不经济。回答挑战,并与成本文化计划的一致性,E&P Indonesie全面推出了一个协作项目,旨在针对井储量的成本效益。浅灯架构(SLA)井设计被引入了良好的架构简化过程的结果。对于防砂,成功的化学增强的砂巩固试验期已经提高了在工业化阶段实施砂巩固的信心作为SLA井中的原砂。本文旨在描述操作员技术,实施和结果的简要开发。
展开▼