首页> 外文会议>POWER-GEN International COAL-GEN Renewable Energy World International Nuclear Power International >A Successful Tor ref ied Biomass Test Burn Program for Cleaner Energy at the PGE Boardman Coal Power Plant (PPT)
【24h】

A Successful Tor ref ied Biomass Test Burn Program for Cleaner Energy at the PGE Boardman Coal Power Plant (PPT)

机译:成功的Tor Ref IED生物量测试烧伤计划,用于PGE Boardman煤电厂(PPT)的清洁能源

获取原文

摘要

1. The project was a great engineering success, resulting in one of the largest full-unit tests of torrefied biomass fuel ever conducted. All four tests were conducted with a primary mandate for safety. 2. The primary reason for success was the dedication of PGE personnel, from the control room to the board room. Equally important was the commitment to planning, preparation, and proper test procedures. 3. Of the scores of test burns I’ve worked on in my career, this was the best-planned and best-executed. I was honored to have been asked to participate.
机译:1.该项目是一个巨大的工程成功,导致了迄今为止最大的全体单元测试之一。所有四项测试都以主要授权进行安全。 2.成功的主要原因是PGE人员的奉献,从控制室到董事会室。同样重要的是致力于规划,准备和适当的测试程序。 3.在我的职业生涯中,我在职业生涯中致力于燃烧的分数,这是最好的计划和最合适的。我很荣幸被要求参加。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号