Owner’s Engineer Services for the Kpone Independent Power Plant (KIPP) Project

机译:适用于KPONE独立电厂(KIPP)项目的所有者的工程师服务

获取原文

摘要

The concept of hiring an Owner’s Engineer has been used for almost two decades. In large-scale power plant projects the Owner’s Engineer generally consists of a team of independent experts that serves as an advocate for the owner. In his role, the Owner’s Engineer supports the owner to meet the planned project’s metrics: time, quality and budget. Fulfilling this role for the 350 MW combined-cycle power plant project Kpone Independent Power Plant (KIPP) in Ghana is a unique challenge considering the significant technical challenges, complex project contract landscape as well as the difficult local conditions. This report highlights the approach taken by STEAG Energy Services GmbH as Owner’s Engineer in supporting the Owner in reaching the project’s time, quality and budget goals as well as addressing unique challenges in the KIPP project.
机译:雇用所有者工程师的概念已经过去二十年。在大型电厂项目中,所有者的工程师通常由一支独立专家团队组成,作为主人的倡导者。在他的角色中,所有者的工程师支持所有者符合计划项目的指标:时间,质量和预算。在加纳的350 MW联合循环电厂项目kpone独立电厂(KIPP)的符合赛克隆独立电厂(KIPP)是考虑重要的技术挑战,复杂的项目合同景观以及困难的当地条件的独特挑战。本报告突出了Steag Energy Services GmbH作为所有者工程师所采取的方法,支持所有者在达到项目的时间,质量和预算目标以及解决KIPP项目中的独特挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号