首页> 外文会议>European Wind Energy Association Annual Event >Evaluation of pre/post construction energy of a windfarm in complex conditions with different measurement strategies
【24h】

Evaluation of pre/post construction energy of a windfarm in complex conditions with different measurement strategies

机译:不同测量策略复杂条件下风速预/后施工能量的评价

获取原文

摘要

This study compares the estimated annual energy production results using four different scenarios of measurement strategies (two meteorological masts with different time periods: one - three years) with the actual annual energy production of the windfarm for a two year period. The estimated energy yield has been corrected using available mesoscale/global reanalysis data for each time period. All uncertainty factors were taken into account and a comparison between the probability values of the estimated production has been additionally performed.
机译:本研究比较了使用四种不同的测量策略方案(两个具有不同时间段的气象桅杆:三年)的估计年能生产结果,其中一年期间的Interfarm实际能源生产。每次时段的可用Mesoscale /全局重新分析数据都已经校正了估计的能源产量。所有不确定性因素都被考虑,并另外进行了估计生产的概率值之间的比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号