首页> 外文会议>Abu Dhabi International Petroleum Exhibition Conference >Right Data, Right Place, Right Time: The Evolution of a Data Acquisition Strategy for a Tight Gas Development in the Sultanate of Oman
【24h】

Right Data, Right Place, Right Time: The Evolution of a Data Acquisition Strategy for a Tight Gas Development in the Sultanate of Oman

机译:正确的数据,正确的地方,正确的时间:在阿曼苏丹国苏丹国苏丹国的紧密天然气发展数据采集策略的演变

获取原文

摘要

BP is developing the Khazzan and Ghazeer fields of Block 61 in the Sultanate of Oman. The development includes three Cambro-Ordovician tight gas sand reservoirs which require hydraulic fracturing for commercial production rates. There are challenges with depth and high temperature for the open hole logging environment, with a restrictive inner diameter and residual proppant creating challenges for the cased hole logging environment. Additionally, there are cost challenges on all data acquisition including coring, downhole gauges, sampling, proppant tracers and many other forms of surveillance. This paper outlines the evolution of the data acquisition strategy for the Khazzan and Ghazeer assets. The development plan at project sanction was 20 vertical and 272 horizontal wells. The data acquisition strategy led to the development of a data acquisition plan, and all stakeholders were engaged to ensure the right data was acquired in the right place at the right time. Cross functional behaviours and fiscal discipline were essential in this process. Inclusion of the service companies into the wider BP team was crucial to ensure appropriate technology was applied, learning from previous operations implemented and new technology options made available. Through careful management of the data acquisition plan, all data in development wells prior to first gas were acquired within the allocated data acquisition budget despite drilling 20% more wells than originally planned for this period. Early improvement in subsurface understanding enabled an overall reduction in well count for the life of the project, extension of the original development into unpenetrated areas, adding significant value to the project.
机译:BP正在在阿曼苏丹国开发Khazzan和Ghazeer领域的框61。该开发包括三个Cambro-OrdiCian紧的气体砂水库,需要用于商业生产率的液压压裂。开放孔测井环境的深度和高温有挑战,内径限制和残留支撑剂为套管孔测井环境产生挑战。此外,所有数据采集都有成本挑战,包括芯,井下仪表,采样,支撑剂示踪剂和许多其他形式的监视。本文概述了Khazzan和Ghazeer资产的数据采集战略的演变。项目制裁的发展计划是20垂直和272个水平井。数据采集​​策略导致数据采集计划的发展,所有利益相关者都订婚,以确保正确的数据在正确的时间内获得正确的数据。跨功能行为和财政纪律在这一过程中至关重要。将服务公司纳入更广泛的BP团队至关重要,以确保应用适当的技术,从以前的运营学习和提供的新技术选择。通过仔细管理数据采集计划,虽然在此期间钻出了20%的井,但在分配的数据收购预算中获得了第一天然气之前的所有数据。地下理解的早期改善使项目的使用寿命的整体减少了整体减少,将原始开发延伸到未长期的区域,为项目增加了重大价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号