TIME, COST AND QUALITY MANAGEMENT TRILOGY AND ITS IMPACT ON LEBANESE CONSTRUCTION PROJECTS SUCCESS

机译:时间,成本和质量管理三部曲及其对黎巴嫩建设项目成功的影响

获取原文

摘要

The construction industry plays significant role in the economy of developing countries, where Lebanon is one of. However, the performance industry remains under critique. Many projects encounter considerable time and cost overruns, fail to realize their intended benefit or even totally terminated and abandoned before or after their completion. As the construction project goes through many phases, the success of each phase will affect the success of the project. Thus, the "Project Success" notion is becoming a priority in the Lebanese construction sector. This paper describes a study of the time, cost and quality management trilogy impact on the success of the local Lebanese construction projects. It shows the importance of each factor and its role in the attainment of client objectives. A Questionnaire survey, supported by "face to face" interviews, elicit the attitude of owners (developers), consultants, and contractors towards the factors affecting each parameter is done. Conclusion and remarks for future construction quality system rating will follow.
机译:建筑业在发展中国家的经济中发挥着重要作用,黎巴嫩是其中之一。但是,绩效产业仍然受批评。许多项目遇到了相当长的时间和成本超支,未能在完成之前或之后完全终止和遗弃。由于建筑项目经历了许多阶段,每阶段的成功将影响项目的成功。因此,“项目成功”的概念正在成为黎巴嫩建设部门的优先事项。本文介绍了对当地黎巴嫩建设项目成功的时间,成本和质量管理三部曲的研究。它显示了每个因素的重要性及其在实现客户目标方面的作用。由“面对面”访谈支持的调查问卷调查,引出所有者(开发人员),顾问和承包商对影响每个参数的因素的态度。结论及以下建筑质量体系评级将遵循。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号