首页> 外文会议>International Conference on Advanced Conceps in Mechanical Engineering >Experimental analysis of the self-erection mechanism of self-erecting cranes
【24h】

Experimental analysis of the self-erection mechanism of self-erecting cranes

机译:自架式起重机自立机制的实验分析

获取原文

摘要

In this paper is presented the experimental analysis of the self-erection mechanism of the self-erecting cranes for the erection process from the transport to the building site state to the normal working state. The force in the rod of the erection hydraulic cylinder and the stress and strain on one of the mechanism's bars were determined experimentally. Measuring the stress and strain was carried out by using strain gauges bonded to the measured element and by using data acquisition equipment. The measurements were carried out in real working conditions on a Potain Igo 18 in a working building site.
机译:本文介绍了自架式起重机对勃起处理的自立机构从运输到建筑工地状态到正常工作状态的实验分析。通过实验确定竖立液压缸的杆中的力和一个机构条的应力和应变。通过使用与测量元素粘合的应变仪和使用数据采集设备来测量应力和菌株。测量在工作建筑工地的Potain IGO 18上的真实工作条件下进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号