首页> 外文会议>Nigeria Annual International Conference and Exhibition >Challenges of and Learnings from Abandonment Operations in the Niger Delta
【24h】

Challenges of and Learnings from Abandonment Operations in the Niger Delta

机译:尼日尔三角洲放弃业务的挑战和学习

获取原文

摘要

Abandonment of wells is a significant part of oilfield abandonment, accompanied by abandonment of facilities and installations. Well abandonment operations in the Niger Delta of Nigeria have covered different categories of wells; 1. Previously suspended wells. 2. Completed wells of varied completions design- single string, two string dual, two string multiple. 3. Wells with varying degree of vandalisation including cases where entire wellhead system were cut off and stolen. Long term safety and prevention of reservoir wellbore fluids, or gas from being released to the environment, is a top priority. While well abandonment is subject to detailed planning from the early design stages for a well, external circumstances throughout the well life may pose new needs or challenges that need to be factored in and addressed when approaching the actual abandonment. For vandalised wells, their condition makes sub-surface abandonment objectives difficult to achieve. Compliance to desirable permanent barrier isolation strategy and legislation becomes technically more challenging. Dual string wells with tubing hangers severed off are difficult to handle. In wells with high deviation, loss of tension on the tubing due to the severed hanger can cause a permanent buckling in deeper sections, making it impossible to run in tools. Wells completed in multiple zones are faced with the risk of inter-zonal communication in the case where pressure regimes are significantly different, which could lead to more complicated sub-surface challenges. This also creates the risk of having combined loss and kick situation from two different reservoirs respectively. The increasing severity of vandalisation has re-inforced these risks and has increased the cost of abandonment significantly. This paper highlights the challenges and learnings from an abandonment campaign in the Niger Delta. The unique experience of abandonment operations on vandalised wells is detailed. A focus on further potential cost savings game changers hinged on efficient execution, competitive scoping and leveraging on technology is discussed.
机译:遗弃井是油田放弃的重要组成部分,伴随着遗弃设施和装置。尼日利亚尼日尔三角洲的良好放弃业务涵盖了不同类别的井; 1.以前悬挂的井。 2.完成了各种完井的井设计 - 单字符串,两个字符串双重,两个字符串多个。 3.具有不同破坏程度的井,包括整个井口系统被切断并偷走的情况。长期安全性和预防水库井眼流体或释放到环境的天然气是一个首要任务。虽然良好的遗弃情况受到早期设计阶段的详细规划,但在整个井生活中的外部环境可能会在接近实际遗弃时占据需要考虑的新需求或挑战。对于破坏的井,他们的病情使子表面放弃目标难以实现。遵守理想的永久障碍隔离策略和立法在技术上更具挑战性。带有管道吊架的双弦井难以处理。在具有高偏差的孔中,由于切断的吊架引起的管道上的张力损失可能导致更深的部分中的永久性屈曲,从而不可能在工具中运行。在多个区域中完成的井面临着局部通信的风险,在压力制度显着不同,这可能导致更复杂的子表面挑战。这也产生了分别从两个不同的储层中丧生和踢球局势的风险。破坏的严重程度越来越严重已经重新启动了这些风险,并提高了遗弃成本。本文突出了尼日尔三角洲遗弃竞选活动的挑战和学习。详细说明了破坏井的遗弃操作的独特体验。讨论了对高效执行,竞争范围和利用技术的进一步潜在成本节约的游戏变更器。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号