首页> 外文期刊>American Journal of Engineering Research >Project Network Analysis Model to Dredging Operations In Niger Delta
【24h】

Project Network Analysis Model to Dredging Operations In Niger Delta

机译:尼日尔三角洲疏Dr作业的项目网络分析模型

获取原文
           

摘要

The research work thrives to evolve proper planning, scheduling, controlling of dredgingactivities, timing and task allocations using well-known project management techniques. The whole essence ofthe research is applying the renowned network project model- critical path method [CPM]. The projectactivities time period 2014-2017 was scheduled for data collections. The CPM was applied for data analysis todecipher completely the usefulness of this work. Finally, the results obtained from the analysis of the eventsfrom node 1 to node 15 in figure 1 critical path method scheme for the project are zero slack time of each eventdetermining critical activities for the two dredging sites [Aleto-Eleme and Rumu-opara-ali] in Port Harcourtmetropolis Rivers State. The economics of this research work to the two dredging operations was cost ofproduction was minimized for project designed for two months was achieved within 49 days and the extra daysspent on new dredging operations.
机译:研究工作蓬勃发展,可以使用众所周知的项目管理技术来发展适当的计划,调度,疏of活动控制,时间安排和任务分配。研究的全部实质是应用著名的网络项目模型关键路径方法[CPM]。 2014-2017年项目活动时间段计划用于数据收集。 CPM用于数据分析,以完全解读这项工作的有用性。最后,从图1关键路径方法方案中的节点1到节点15的事件分析获得的结果是,每个事件的零松弛时间决定了两个挖泥场的关键活动[Aleto-Eleme和Rumu-opara-ali ]在港口Harcourtmetropolis河流州。这两项挖泥作业的研究工作的经济效益是,在49天内完成了为期两个月的项目设计,将生产成本降至最低,而新挖泥作业又花费了额外的几天。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号