Research on Cost Management of Construction Project based on Activity-based Costing

机译:基于活动的成本核算的建设项目成本管理研究

获取原文

摘要

This paper, based on the principle of activity-based costing, mainly introduced the specific process of applying the method in cost accounting and cost forecasting during the Project Construction being constructed. Through using the activity-based costing to calculate the actual cost and the budget cost in the process of project construction, which to be compared to analysis the cost deviation, while predicting the material supply-demand relationship of next issue. Furthermore, in the light of the deviation, reengineer the process of project construction and adjust resource supply level, thereby effectively refine and control costs, improve management and competitiveness of project contractor.
机译:本文基于以基于活动的成本核算的原理,主要引入了在建造项目建设期间应用于成本核算和成本预测中的特定过程。通过采用基于活动的成本计算,计算项目建设过程中的实际成本和预算成本,与分析成本偏差进行比较,同时预测下一个问题的材料供需关系。此外,鉴于偏差,重新发动机项目建设过程和调整资源供应水平,从而有效地改进和控制成本,提高项目承包商的管理和竞争力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号