Application of cable erection method to construction of concrete arch bridge in alpine and high elevation area

机译:电缆竖立方法在高山高度拱桥混凝土拱桥建设中的应用

获取原文

摘要

1# bridge traffic engineering of LiangHeKou hydropower station is located in ganzi region in sichuan province. The altitude of main construction areas lies above the 2700m, perennial mean temperature ranges from -4.9 – 7.9°C, extreme low temperature reach -42.9°C, the temperature difference between day and night, which may adversely affect the execution of the precast concrete and cable erection. Based on the fully and deeply analyse and optimal approaches, We solved several key engineering challenges in precast arch box construction, and also provided valuable experiences for similar projects.
机译:1#升华水电站的桥梁交通工程位于四川省甘孜地区。主要建筑区域的高度介于2700米以上,多年生平均温度范围为-4.9 - 7.9°C,极端低温达到-42.9°C,白天和夜间温度差异可能对预制混凝土的执行产生不利影响和电缆勃起。基于完全和深度分析和最优方法,我们解决了预制拱箱建设中的几个关键工程挑战,并为类似项目提供了有价值的经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号