首页> 外文会议>Taishan Academic Forum >Study on the Rapid Excavation Technology of Deep Large Cross-section Rock Tunnel
【24h】

Study on the Rapid Excavation Technology of Deep Large Cross-section Rock Tunnel

机译:深大横截面岩隧道快速开挖技术研究

获取原文

摘要

Based on the characteristics of the deep large cross-section rock tunnel, inclined empty wedgy cutting technique, mechanized working line composing of full-hydraulic excavating drill-camel and loader buckets, secondary bolt/shotcreting support technique are proposed. These techniques effectively solve the problems of small footage in the rock tunnel, slow transferring rate and the unstable support in the deep tunnel. The shaping quality is improved; the time of working procedure is shortened and the driving speed is boosted.
机译:基于深层大横截面岩石隧道的特点,提出了全液压挖掘钻孔和装载桶的机械化工作线组成,提出了次级螺栓/喷射支撑技术。这些技术有效地解决了岩石隧道中小镜头的问题,慢速转移率和深隧道中不稳定的支撑。成型质量得到改善;缩短了工作过程的时间,提高了驾驶速度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号