首页> 外文会议>Coiled Tubing Well Intervention Conference >First Offshore Coiled Tubing Intervention Using a Catenary System in the Gulf of Mexico
【24h】

First Offshore Coiled Tubing Intervention Using a Catenary System in the Gulf of Mexico

机译:首先在墨西哥湾中使用脉链系统的近海盘绕管道干预

获取原文

摘要

Coiled tubing(CT)operated from a floating anchored vessel(FAV)was developed for well intervention in offshore locations where crane limitations and deck loading constrains imposes various limitations on the ability to perform workover operations.This tailor-made solution involves the operation of a CT unit with the tubing reel located on a FAV and the injector head positioned on the offshore platform.Today,CT operations supported by a FAV are routinely performed in several countries,including Malaysia,Gabon,Tunisia,Brunei,Angola and the North Sea. The first CT operation supported with a vessel in the Gulf of Mexico was successfully performed in a non-producing well which had been shut-in for nine months due to compatibility issues with the structure for temporary installing service equipment and and the limited availability of jack-up platforms to provide a deck area for positioning CT equipment.As result of this successful operation,a new perspective of CT rigless interventions was adopted in offshore Mexico,thus allowing the operator to improve equipment utilization for both CT units and workover rigs,in order to maximize oil production. This paper details the analysis,execution and evaluation of the first CT operation from a FAV in offshore Mexico,which includes equipment selection,sea condition and weather-related studies,contingency planning,personnel competency and training requirements,and logistical considerations,among other technical factors that were critical in the implementation of such project.As well,the benefits that were realized by the operator regarding production enhancement and operational cost reduction are covered.
机译:连续油管(CT)从浮锚定容器(FAV)操作是为在离岸地点油井干预其中起重机局限性和甲板负载约束强加执行修井operations.This定制解决方案的能力的各种限制涉及的操作而开发CT单位与位于FAV的管道和注射器头部位于近海平台上。优化的CT运营是在几个国家/地区进行的,包括马来西亚,加蓬,突尼斯,文莱,安哥拉和北海。在墨西哥湾的船舶中支撑的第一个CT操作在不生产的井中成功进行,由于临时安装服务设备的结构和千斤顶可用性有限的兼容性问题,因此已经被关闭了9个月。用于为定位CT设备提供甲板区域的平台。在墨西哥海上墨西哥采用了这一成功运营的结果,这是CT严格干预的新视角,从而允许操作员提高CT单位和工作台钻机的设备利用率为了最大化石油生产。本文从海上墨西哥FAV,其中包括设备选型,海况和天气有关的研究,应急规划,人员能力和培训需求,以及后勤方面的考虑,其他技术中详细介绍了第一台CT操作的分析,执行和评估在执行此类项目方面至关重要的因素。嗯,涵盖了经营者对生产提升和业务成本减少的实现的好处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号