首页> 外文会议>Coiled Tubing Well Intervention Conference >Recent Developments to Coiled Tubing Equipment Design Improves Efficiency and Safety
【24h】

Recent Developments to Coiled Tubing Equipment Design Improves Efficiency and Safety

机译:卷绕管道设备设计的最新发展提高了效率和安全性

获取原文

摘要

To meet the demand for energy,operators are turning to development of unconventional resources.It is estimated that there are more than 750 trillion cubic feet of technically recoverable shale gas and 24 billion barrels of technically recoverable shale oil resources in discovered shale plays in the US alone.Tight rock in the longer horizontal shale-oil plays requires both longer lateral wells and multistage fracturing to maximize oil recovery.Coiled tubing(CT)plays an essential role in post-frac cleanup,requiring both safe and efficient equipment. Unconventional shale well construction has taken on a factory construction approach,with more than 20,000 horizontal wells being drilled each year in the US.These long lateral lengths require larger CT units(CTUs)with larger outside diameter(OD)strings,which often increases the number and size of the equipment loads necessary to service the wells. Service providers are being challenged with ways to increase the speed and efficiency of these larger service packages,while maintaining or improving safety performance. This paper discusses how the unique design of a mast unit trailer and associated equipment meets this challenge with its 5 1/8-in.preassembled well control equipment(WCE)stack and its ability to contain a full milling assembly combined with a fluidic oscillator in its riser stack.The system has also been designed to be versatile and enables a variety of WCE sizes and configurations to be mounted on the trailer to help ensure customized solutions to many operational challenges. The system offers substantial improvements in terms of rig-up time compared to a conventional CTU.Field trails have shown the preassembled WCE stack can significantly reduce rigup time by as much as 50%by reducing the number of bolts required to be made up and torqued on site. The paper also explains how the unique design improves operational safety.With the reduced number of bolts required to be made up onsite,hand and finger injuries associated with hammer wrenches and dropped objects can be vastly reduced. When the trolley is raised and latched into position,dangers associated with making up a bottom-hole assembly(BHA) directly under a suspended crane load have been removed.Even if the crane were to fail,the mast and trolley is designed to sustain the entire load of the injector,stripper,riser,and blowout preventer(BOP).
机译:为了满足对能源的需求,运营商正在转向发展非传统资源的发展。据估计,在美国发现的页岩扮演的页岩扮演中有超过75万亿立方英尺的技术可收回的页岩气体和240亿桶的技术可恢复的页岩油资源单独的岩石在较长的水平页岩油剧中需要较长的横向孔和多级压裂,以最大化石油回收.Coiled管道(CT)在近距离清理中起重要作用,需要安全和有效的设备。非传统的页岩井建筑采取了工厂施工方法,每年在美国钻取超过20,000个水平井。这些长度长度需要更大的CT单位(CTU),外径较大(OD)弦,这通常会增加服务井所需的设备负载的数量和大小。服务提供商正在挑战,以提高这些较大的服务套餐的速度和效率,同时保持或提高安全性能。本文讨论了桅杆单位拖车和相关设备的独特设计如何符合其5 1/8英寸的挑战。软化良好的井控制设备(WCE)堆栈及其包含全铣削组件的能力与流体振荡器相结合它的提升机堆栈。该系统也被设计为多功能,并实现各种WCE尺寸和配置要安装在拖车上的配置,以帮助确保定制的解决方案到许多操作挑战。与传统的CTU相比,系统提供了大量改进。与传统的CTU相比,菲尔德的WCE堆栈可以通过减少所需的螺栓数量来显着降低50%的钻石时间可以显着降低50%现场。本文还解释了独特的设计如何改善操作安全。在现场所需的螺栓数量减少,可以大大降低与锤子扳手和掉落物体相关的手和手指伤害。当手推车升高并锁定到位时,已经拆除了与构成悬挂起重机负荷直接构成底孔组件(BHA)相关的危险。即使起重机失效,桅杆和手推车旨在维持注射器,剥离器,提升管和井喷预防器(BOP)的整个负载。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号