LHC LONG SHUTDOWN: A PARENTHESIS FOR A CHALLENGE

机译:LHC Long Shutdown:挑战的括号

获取原文

摘要

After three fruitful years of operation, the LHC will enter a long shutdown. Major works will be implemented to allow running safely at seven TeV/beam. The LHC superconducting circuits will be consolidated; mitigation measures will be carried out to reduce the single event effects occurrence in the frame of the Radiation To Electronics mitigation project (R2E); all the equipment will be fully maintained. In parallel, numerous consolidation and upgrade activities will be performed all around the 27 km ring. The schedule has been optimized in order to reduce the length of the shutdown (LS1) to 22 months (including hardware commissioning). The organization of the works is therefore essential to ensure a safe and reliable plan. This paper introduces the various activities to be performed and presents the schedule and the preparation process, including the operational safety aspects.
机译:经过三年富有成效的运作,LHC将进入长期关机。将实施主要作品以允许在七个TEV /光束上安全运行。 LHC超导电路将合并;将进行缓解措施,以减少辐射框架的单一事件效应,对电子缓解项目(R2E);所有设备都将完全维护。同时,众多合并和升级活动将在27公里的环绕周围进行。该计划已被优化,以减少关闭(LS1)至22个月(包括硬件调试)的长度。因此,该作品的组织对于确保安全可靠的计划是必不可少的。本文介绍了要执行的各种活动,并提出了计划和准备过程,包括运营安全方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号