Composite foundation settlement of piled raft structure in Da Xi passenger dedicated line is analyzed by the large finite element software MIDAS/GTS and established calculation model of foundation treatment. The problem of pile-soil contact is highlighted in the trail and analyzes the settlement nephogram and pile-soil stress nephogram. On this basis the foundation settlement factors was analyzed systematically that focus on the elastic modulus of pile, pile spacing, pile diameter and pile length in foundation treatment, especially for the characteristics parameters of contact element. Result shows that increasing the pile modulus, pile diameter, pile length and decreasing the pile spacing is all conducive to reducing settlement. The best advice is got that the pile diameter should be not more than 0.5m, pile length not more than 27m and the pile spacing be around 2m.
展开▼