首页> 外文会议>Environmental Connection Conference >The SWPPP vs. the Permit vs. the Specs: An Uneasy Marriage Among Related Documents
【24h】

The SWPPP vs. the Permit vs. the Specs: An Uneasy Marriage Among Related Documents

机译:SWPPP与许可证与规范:相关文件之间存在不安的婚姻

获取原文

摘要

If you could roll back the erosion and sediment control clock twenty-six or twenty-seven years, to just before the Phase 1 regulations came out, but include a robust intent to prevent pollution from a construction site due to earth moving and other construction activities, what would the contract documents prepared by the design professional and given to the contractor look like? Impossible, you say? Perhaps. Back then we included nothing, or at best precious little, to prevent pollution from a construction site. We looked upon it as a non-point source, thus not subject to regulation, and to force a contractor to control pollution in construction site run-off would have been seen as an "unnecessary7' expense. And, perhaps we looked on it a little as environmental extremism.
机译:如果您可以回滚侵蚀和沉积物控制时钟二十六或二十七年,就在第1阶段法规出现之前,但包括强大的意图,以防止由于地球移动和其他施工活动为防止施工现场的污染,设计专业人员编写的合同文件是什么,给承包商看起来像?你说不可能?也许。然后我们没有任何东西,或者以最好的珍贵小,以防止施工现场的污染。我们认为它是一个非点来源,因此不受规定的影响,并迫使承包商控制施工现场的污染,这将被视为“不必要的7”费用。而且,也许我们看了一个一点是环境极端主义。

著录项

  • 来源
    《Environmental Connection Conference》|2016年|1317-1997 p.|共7页
  • 会议地点
  • 作者

  • 作者单位
  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类 S157-532;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号