首页> 外文会议>Ontario Power Symposium >An Overview of Progress to Develop and Power Ontario's Northerly Regions (PPT)
【24h】

An Overview of Progress to Develop and Power Ontario's Northerly Regions (PPT)

机译:发展和发电的进展概述和北方北部地区(PPT)

获取原文
获取外文期刊封面目录资料

摘要

1 Five Nations Energy Inc. is one of several electricity transmitters licensed by the Ontario Energy Board in the province of Ontario 2 Operates a 275km transmission line along with three distribution stations servicing the communities of Fort Albany, Kashechewan, and Attawapiskat. 3 Provides a connection to the line from Attawapiskat to De Beers Canada's Victor Mine diamond mine project west of Attawapiskat 4 FNEI is owned by the First Nations of Attawapiskat, Kashechewan, and Fort Albany through their respective local distribution companies. The Moose Cree First Nation and the Taykwa Tagamou Nation also have a seat on FNEI's Board of Directors. 5 Original $65M construction costs financed with a combination of government contributions and private financing.
机译:1五个国家能源Inc.是安大略省安大略省能源委员会许可的电力传播者之一,2运行了275公里的传输线,以及为奥尔巴尼堡,喀什温省和atrawapiskat的社区提供三个配送站。 3提供了与Attawapiskat的线路的连接到De Beaers Canada的Victor Mine钻石矿山项目,以西4 Fnei由Attawapiskat,Kashechewan和奥尔巴尼堡通过各自的当地分销公司拥有。 Moose Cree First Nation和Taykwa Tagamou Nation也在Fnei的董事会上座位。 5原装6500万美元的建筑成本,融资了政府贡献和私人融资。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号