首页> 外文会议>Ontario Power Symposium >Examining the Future Structure of Ontario's Electricity Market: Should Ontario Incorporate a Capacity Market or Alternative Structural Framework? (PPT)
【24h】

Examining the Future Structure of Ontario's Electricity Market: Should Ontario Incorporate a Capacity Market or Alternative Structural Framework? (PPT)

机译:检查安大略省电力市场的未来结构:安大略省应该融合一个容量市场或替代结构框架吗? (PPT)

获取原文

摘要

1 maintain reliability, power systems must maintain sufficient capacity resources (e.g., generation, demand-response, etc.) to meet peak demand requirements plus reserve margins (together referred to as a resource adequacy requirement (RAR)) 2Under traditional U.S. utility regulation, RARs are met by Load-Serving Entities (LSEs) by holding portfolios of resources (i.e., own, bilateral contracts, etc.) to meet their power system's reliability needs 3 upplementing LSE obligations, Capacity Markets are mainly a U.S. electricity market restructuring concept administered by northeastern ISOs (NYISO, ISO NE, PJM), where these markets are auctions to provide participants with signals and commitments to maintain their resources and afford more lead-time and certainty for investment in new resources with the primary goal of meeting applicable RARs at just and reasonable prices while not unduly discriminating or preferentially selecting specific resources.
机译:1维持可靠性,电力系统必须保持足够的容量资源(例如,生成,需求 - 反应等)以满足峰值需求要求加上储备利润率(共同称为资源充足要求(RAR))2,2在传统的美国公用事业法规,通过持有资源组合(即,自己,双边合同等)的负载服务实体(LSE)满足Rars,以满足其电力系统的可靠性需求3次汇总伦理义务,产能市场主要是美国电力市场重组概念由东北伊索斯(Nyiso,Iso Ne,PJM),这些市场都有借调,为参与者提供信号和承诺,以维持其资源,为新资源的投资提供更多的带薪时间和确定性,主要是会议适用的RARS的主要目标只有合理的价格,而不会过度歧视或优先选择特定资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号