首页> 外文会议>SPE Offshore Europe Conference >Reservoir Management: Preparing for Field Redevelopment and Restart
【24h】

Reservoir Management: Preparing for Field Redevelopment and Restart

机译:水库管理:准备现场重建和重启

获取原文

摘要

The Schiehallion and Loyal oil fields located in Quad 204, and neighbouring Foinaven, all west of the Shetland Isles, are the first group of North Sea deep-water fields to be developed and together form a huge subsea development. As part of the Quad204 Project Schiehallion and Loyal are being re-developed to extend field life and this requires infill drilling, replacement of some subsea infrastructure and replacement of the Floating Production, Storage and Offloading vessel (FPSO) to service the extended scope. The reservoirs will remain shut-in for a period of up to three years whilst the FPSO Schiehallion is disconnected, the site is prepared and the new FPSO is hooked-up. There are fifty-two wells (25 producers and 27 injectors) and this is the first time that bp has shut-in a field for so long at such scale. Many wells access mature, water-flooded, multi-layer reservoirs which have been flowing for 15 years. The infill drilling programme will be providing additional well-stock and production for the new FPSO but the majority of the rate at restart will be supplied by the existing wells so it is essential that the fields are prepared carefully and left in a healthy and predictable state for the shut-in and subsequent restart. Fifteen years of production has created differential oil depletion both areally and vertically between layers. Factors to be considered include: minimising hydrogen sulphide development in the reservoir, maintaining the Christmas trees that reside within the hydrate-forming envelope, existing well issues and corrosion treatments for preservation. The shut-in of the fields is complicated by the requirement for continued low-levels of production for the purposes of cleaning the FPSO cargo tanks – and continued injection support whilst cleaning. This paper discusses the preparation and planning for the reservoir activities and the coordination of reservoir management with facilities requirements during the shut-in of the wells.
机译:位于Quad 204的Schiehalion和Loyal油田,以及邻国西部的邻近的Foinaven,是第一批北海深水田的开发,共同形成巨大的海底发展。作为Quad204项目的一部分,Schiehallion和忠诚正在重新开发,以扩展现场生活,这需要填充钻探,更换一些海底基础设施,更换浮动生产,储存和卸载船(FPSO)以提供延长的范围。水库将保持长达三年的时间,而FPSO Schiehallion已断开连接,该网站已准备好,新的FPSO是连接的。有五十二个井(25个生产商和27个注射器),这是第一次在这种规模上为BP长时间关闭领域。许多井接入成熟,水淹水,多层水库15年来。填充钻井计划将为新FPSO提供额外的良好库存和生产,但重启的大部分速率将由现有的井提供,因此必须在健康和可预测的状态下仔细准备田地关闭和随后重启。十五年生产在层之间产生了差异油耗尽,在层之间产生了差异的油耗。所考虑的因素包括:最小化储层中的硫化氢发育,维持驻留在水合物形成封套的圣诞树,现有的井问题和保存腐蚀治疗。由于清洁FPSO货罐的目的,因此在持续的低水平生产的要求下,该领域的关闭是复杂的,并且在清洁的情况下继续注入支持。本文讨论了水库活动的制定和规划,并在井中携带了设施要求的水库管理的协调。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号