首页>
外国专利>
MANAGEMENT METHOD OF GUARANTEE AND LOAN FOR REDEVELOPMENT RECONSTRUCTION AND AN INTEGRATED INFORMATION MANAGEMENT SYSTEM BY CREATION THEREOF
MANAGEMENT METHOD OF GUARANTEE AND LOAN FOR REDEVELOPMENT RECONSTRUCTION AND AN INTEGRATED INFORMATION MANAGEMENT SYSTEM BY CREATION THEREOF
展开▼
机译:重建的担保和贷款管理方法及基于此的集成信息管理系统
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a guarantee for redevelopment redevelopment, a method of operating a loan and an integrated information management system generated through the redevelopment. Of course, it is possible to provide financing under the amount of financing approved on the basis of the guarantee without a separate joint guarantee by the contractor, and the guarantee institution can act as the central information center in carrying out maintenance projects. In order to resolve information imbalances, the company will manage and supervise the sale costs appropriately by preventing subcontractors from insolvency and monitoring. In the case of small and medium-sized subcontractors, financing is difficult due to evasion of guarantee institutions and financial institutions. We can support the material purchase fund of small and medium-sized subcontractors who perform maintenance business to solve the problem, and use the same superior position as the contractor to reduce the price of materials due to competition between material companies for the participation of B2B and disclosure of material purchase conditions. The cost of union members and the cost of sale can be reduced, and subcontractors can pay upfront due to the introduction of the guarantee of payment by the guarantee institution. Can contribute to win-win management policies, and through the integrated information center system of maintenance projects, information on material purchase history is disclosed to strengthen construction management functions for construction works of the union and transparency by linking some of the information with local government servers. The union, members, and contractors will be able to It is possible to inquire about the purchase and payment details, and it is possible to manage the construction transparently by preventing irrationality between the union and the construction company, and the total quantity of materials required at the maintenance site of the local government is the specification for the project execution. As it can be identified in advance through the subcontractor has improved the process so that the subcontractor can purchase the quantity purchased by the improved purchase conditions.
展开▼