首页> 外文会议>International Conference on Civil Engineering, Architecture and Sustainable Infrastructure >Simulation Analysis on Construction Control of Low Tower Cable-stayed Bridge
【24h】

Simulation Analysis on Construction Control of Low Tower Cable-stayed Bridge

机译:低塔斜拉桥施工控制仿真分析

获取原文

摘要

To ensure the construction quality, safety and reliability, according the design drawings, construction process and the related design code, this paper establishes the simulation model by the software of MIDAS/CIVIL for the analysis of construction control of the low tower cable-stayed bridge. The calculation results showed that the maximum cumulative horizontal displacement of the tower and vertical displacement of the beam is 13.8 mm and 154 mm respectively, which can be adjusted by setting camber. At completion state of the cable-stayed bridge, the stresses of the tower and the beam are both in compressive with the maximum of 14.47 MPa and 14.03 MPa respectively, which are both less than the limits of corresponding materials. The bridge is safe and reliable.
机译:为确保施工质量,安全性和可靠性,根据设计图纸,施工过程和相关的设计代码,本文建立了MIDAS /民事软件的仿真模型,用于分析低塔斜拉桥施工控制。计算结果表明,梁的最大累积水平位移和光束的垂直位移分别是13.8mm和154mm,可以通过设置弯曲来调节。在缆绳停留桥的完成状态下,塔的应力和光束分别在压缩中,最大值为14.47MPa和14.03MPa,这均小于相应材料的极限。桥梁是安全可靠的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号