首页> 外文会议>POWER-GEN Europe Conference and Exhibition >Operational Experience with latest GT26 upgrade
【24h】

Operational Experience with latest GT26 upgrade

机译:最新GT26升级的操作经验

获取原文

摘要

This paper looks at both the increased operational flexibility features brought about by the sequential combustion system of the latest GT26 (50 Hz) and GT24 (60 Hz) upgrades launched in 2011, as well as giving an update on the operational capabilities validated at Alstom’s power plant in Birr, Switzerland. In particular, this paper looks at the improved fuel flexibility, the newly introduced flexible operation modes, and the unique low load operation capability – all made possible thanks to the sequential combustion system of the GT26/GT24.
机译:本文介绍了2011年推出的最新GT26(50 Hz)和GT24(60 Hz)升级的顺序燃烧系统所带来的运营灵活性功能的增加,以及在阿尔斯通的权力上验证的操作能力更新植物在波尔,瑞士。特别是,本文介绍了燃料灵活性的提高,新引进的灵活操作模式,以及独特的低负载操作能力 - 由于GT26 / GT24的顺序燃烧系统,所有都可以实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号