The Application of Fuzzy Comprehensive Evaluation in Risk Assessment of Incremental Launching Bridge

机译:模糊综合评判在增量发射桥风险评估中的应用

获取原文

摘要

The risk factors of continuous incremental launching bridge during construction stage are specialized. The risk in incremental launching stage is analyzed and identified. A risk assessment index system is built. A fuzzy comprehensive evaluation model is developed. The results obtained from the risk assessment model verifies the validity and practicality of the developed method by the combination of analytic hierarchy process and fuzzy mathematics theory. Moderate risk assessment results are developed to provide references for incremental launching construction method.
机译:施工阶段连续增量发射桥的危险因素专业。分析和识别增量发射阶段的风险。建立了风险评估指标系统。开发了一种模糊综合评价模型。从风险评估模型获得的结果通过分析层次过程和模糊数学理论的组合来验证开发方法的有效性和实用性。开发了适度的风险评估结果,以提供增量发射施工方法的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号