首页> 外文会议>International Conference on Civil, Architectural and Hydraulic Engineering >Three-dimensional Complex Construction Project Management Maturity Model: Case Study of 2010 Shanghai Expo
【24h】

Three-dimensional Complex Construction Project Management Maturity Model: Case Study of 2010 Shanghai Expo

机译:三维复杂建设项目管理成熟度模型:2010年上海世博会案例研究

获取原文

摘要

The increasing complexity of construction projects as a common trend has had a significant impact on management maturity assessment and improvement for the project participating units, especially for the owners' Project Management Office (PMO). While most maturity models are rationalistic, this paper presents a practical complex construction project management maturity model based on project management three-dimensional perspective. Integrating Organizational Project Management Maturity Model (OPM3) and Best Practices (BPs) derived from 2010 Shanghai Expo practice, this case-based maturity model is constituted by three sub-models: PBS Maturity, Process Maturity and Organization System Maturity. The model uses structured questionnaire consisting of BPs to implement assessment. The proportion of BPs achieved is considered as the maturity level of assessment objectives. Shanghai Expo AB Area is used to test the validity of the model. The result shows that owners' PMO can assess and improve their project management maturity with the model effectively.
机译:作为共同趋势的建设项目的复杂性越来越复杂地对管理到期性评估和项目参与单位的改进产生了重大影响,特别是对业主项目管理办公室(PMO)。虽然大多数成熟模型是理性的,但本文提出了一种基于项目管理三维视角的实用复杂建设项目管理成熟度模型。集成组织项目管理成熟度(OPM3)和来自2010年上海世博会的最佳实践(BPS),这种基于案例的成熟度模型由三个子模型构成:PBS成熟度,过程成熟度和组织系统成熟。该模型使用由BPS组成的结构化问卷来实施评估。所取得的BP的比例被认为是评估目标的到期水平。上海世博会AB区用于测试模型的有效性。结果表明,业主的PMO可以有效地评估和改善其项目管理成熟日。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号