首页> 外文会议>International Conference on Civil, Architectural and Hydraulic Engineering >Comparison for Support Patterns of Temporary Shaft for Construction in Silty Clay
【24h】

Comparison for Support Patterns of Temporary Shaft for Construction in Silty Clay

机译:粉质粘土施工临时轴的支撑图案的比较

获取原文

摘要

Based on a temporary shaft for construction, this paper compared two supporting patterns in the geological condition dominated by silty clay, the open-cut method with tunneling support and the bored piles supporting method, in the respects of ground surface deformation, the envelope structure deformation and the steel brace forces, using the numerical simulation method. And by comparison of the numerical results with the monitoring data, it is verified that the calculation model and methods of analysis are rational. Furthermore, the open-cut method with tunneling support is recommended as the better supporting method that can both ensure the structure safety and economy in areas of similar geological conditions. The paper has some reference value for shaft supports under similar construction conditions.
机译:基于用于施工的临时轴,本文比较了由粉质粘土的地质条件中的两个支撑模式,隧道支撑的开口方法和钻孔桩支撑方法,在地面变形方面,包络结构变形和钢支撑力,使用数值模拟方法。并且通过将数值结果与监测数据进行比较,验证了计算模型和分析方法是合理的。此外,建议使用隧道支撑的开口方法作为更好的支撑方法,可以确保在类似地质条件的区域的结构安全性和经济。本文在类似的施工条件下具有轴支撑件的一些参考值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号