首页> 外文OA文献 >Temporary protection of construction pit for pump station and service shaft
【2h】

Temporary protection of construction pit for pump station and service shaft

机译:泵站和服务井的施工坑的临时保护

摘要

The thesis deals with geostatic analysis of temporary excavation pit for installation of pump station and service shaft. They are part of the project named Renewal of public sewerage, waterwork and road reconstruction in Savska cesta in Kranj. Nearby buildings, local road, Kokra river and design depth of pump station dictate realization of temporary protection of construction pit under phreatic level. Analysis are executed analytically and numericaly using computer program Plaxis. Analytically soil stresses are calculated by Rankine earth pressure theory, otherwise the computer program Plaxis is based on finite element method (FEM). We checked folowing examples of protection of construction pit: cantilever pile wall, anchored pile wall, struted pile wall, well and sheet piling frame. Eurocode standard EC7 is considered in calculations. Various examples are also analysed and compared by economical and technological criterion.
机译:本文针对泵站和服务井的安装临时开挖坑进行静力分析。它们是在克拉尼(Kranj)的Savska cesta进行的名为“公共污水处理,水利工程和道路重建的更新”项目的一部分。附近的建筑物,当地道路,科克拉河和泵站的设计深度决定了潜水位在地下的临时保护。使用计算机程序Plaxis进行分析和数值分析。通过兰金土压力理论计算得出土壤应力,否则计算机程序Plaxis基于有限元方法(FEM)。我们检查了以下保护施工坑的实例:悬臂桩墙,锚固桩墙,斜桩墙,井和板桩框架。在计算中考虑了欧洲法规标准EC7。还根据经济和技术标准对各种示例进行了分析和比较。

著录项

  • 作者

    Šubic Andrej;

  • 作者单位
  • 年度 2010
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"sl","name":"Slovene","id":39}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号