首页> 外文会议>Global Conference on Civil, Structural and Environmental Engineering >Numerical Simulation Analysis and Engineering Applications on the Double-side-wall Heading Step Bench Excavation of Large-cross Section and Shallow Tunnel
【24h】

Numerical Simulation Analysis and Engineering Applications on the Double-side-wall Heading Step Bench Excavation of Large-cross Section and Shallow Tunnel

机译:大横截面和浅隧道双侧壁标题台阶台挖掘数值模拟分析与工程应用

获取原文

摘要

With the pace accelerating of development of urban rail traffic in large and medium-sized cities, urban subway and railway lines need to construct shallow and large-cross section tunnels and especially large-cross section tunnels. Large-cross section tunnel constructions make big influence on the surrounding buildings, roads and environment. How to build underground tunnel fast and safe in the downtown has become an problem which needs to be solved urgently. This article is for the technology of city large-cross section and shallow buried-tunnel, relying on the phase 1 of rail transit no.2 in Changsha, which combined with construction characteristics of the excavation method, double-side-wall method and step method, numerical simulation analysis on influence of the large-cross section tunnel disturbance in the surrounding rock, and provides the necessary technical support.
机译:随着城市铁路交通发展的步伐,城市地铁和铁路线需要构建浅层和大横截面隧道,特别是大横截面隧道。大横截面隧道结构对周围建筑,道路和环境产生了重大影响。如何在市中心快速安全地建设地下隧道已成为一个需要迫切解决的问题。本文适用于城市大横截面和浅埋隧道的技术,依靠长沙轨道运输号的第1阶段,结合挖掘方法的施工特性,双面壁法和步骤围岩大横截面隧道扰动影响的方法,数值模拟分析,提供了必要的技术支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号