首页> 外文会议>Global Conference on Civil, Structural and Environmental Engineering >The problems and suggestions of the desulfurization wastewater Treatment system during the operation
【24h】

The problems and suggestions of the desulfurization wastewater Treatment system during the operation

机译:运行过程中脱硫废水处理系统的问题及建议

获取原文

摘要

Wastewater treatment system was an important part of the wet desulfurization, and it played an important role to improve the quality of absorber slurry. Combined with the problems of desulfurization efficient reduced and moisture content in gypsum exceed normal, this paper pointed out the deficiencies which used the chlorine ion concentration to control the operation of desulfurization waster water;;and suggested the influence of chlorine ion and the other impurities should be studied comprehensively, some guides for in-service supervision on the operation of FGD should be established as soon as possible.
机译:废水处理系统是湿脱硫的重要组成部分,它发挥了提高吸收浆料质量的重要作用。结合脱硫有效减少和石膏中的水分含量的问题超过正常情况,本文指出了使用氯离子浓度来控制脱硫湿润的运作的缺陷;并提出氯离子的影响和其他杂质的影响全面研究,应尽快建立一些关于FGD运营的服务监督的指南。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号