首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Sleeve Valve Pipe and Steel Pipe Micropile fractured tensile reinforcement in combination with the application of a mined-out area
【24h】

Sleeve Valve Pipe and Steel Pipe Micropile fractured tensile reinforcement in combination with the application of a mined-out area

机译:套筒阀管和钢管微量裂缝抗粘连与挖出区域的应用相结合

获取原文

摘要

Due to the early years of mining makes Gob fracture zone, the deformation of rock fracture zone, and gradually developed through. Located in the mined-out area causing tension within fractured zone of discontinuous deformation region arsenal varying degrees of ground and walls to crack, great security risk to the normal operation of the arsenal caused. Project uses Sleeve Valve Pipe and Steel Pipe Micropile reinforcement scheme. This paper describes the details of the reinforcement mechanism, the construction process, technical requirements and quality assurance measures. Practice has proved that the joint reinforcement program can continue to crack the wall of effective governance to ensure the safe operation of the security arsenal.
机译:由于矿井初期制造了GOB骨折区,岩石骨折区的变形,并逐渐通过。位于挖掘区域,造成不连续变形区域的裂缝区内的张力,不连续变形区域突破地面和墙壁裂缝,安全风险的正常运行引起的正常运行。项目采用套管阀管和钢管微疏加固方案。本文介绍了加固机制,施工过程,技术要求和质量保证措施的细节。实践证明,联合强化方案可以继续破解有效治理的墙壁,以确保安全武器的安全运作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号