首页> 美国政府科技报告 >Probability of pipe fracture in the primary coolant loop of a PWR plant. Volume 5. Probabilistic fracture mechanics analysis. Load Combination Program Project I final report
【24h】

Probability of pipe fracture in the primary coolant loop of a PWR plant. Volume 5. Probabilistic fracture mechanics analysis. Load Combination Program Project I final report

机译:pWR工厂主冷却剂回路中管道破裂的可能性。第5卷。概率断裂力学分析。负载组合程序项目I最终报告

获取原文

摘要

The primary purpose of the Load Combination Program covered in this report is to estimate the probability of a seismic induced LOCA in the primary piping of a commercial pressurized water reactor (PWR). Best estimates, rather than upper bound results are desired. This was accomplished by use of a fracture mechanics model that employs a random distribution of initial cracks in the piping welds. Estimates of the probability of cracks of various sizes initially existing in the welds are combined with fracture mechanics calculations of how these cracks would grow during service. This then leads to direct estimates of the probability of failure as a function of time and location within the piping system. The influence of varying the stress history to which the piping is subjected is easily determined. Seismic events enter into the analysis through the stresses they impose on the pipes. Hence, the influence of various seismic events on the piping failure probability can be determined, thereby providing the desired information.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号