首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Design of high speed railway tunnel and its construction method in abrupt slope with loose rockmass
【24h】

Design of high speed railway tunnel and its construction method in abrupt slope with loose rockmass

机译:松散岩石岩体突然坡度高速铁路隧道设计及其施工方法

获取原文

摘要

This paper mainly deals with the structural design of high speed railway tunnel and its driving method in abrupt slope with loose rockmass, meanwhile summarizes the connection between tunnel portal and bridge abutment in loose rockmass according to complicated landform and geology. The anti-slide piles are adopted to retain the stability of abrupt slope near the tunnel portal. In order to eliminate the risk and cost in tunnel construction, four bench cut method is invented to satisfy the safe excavation of loose rockmass in the tunnel. Composite fiber rockbolt is also employed to keep the stability of working face while driving the tunnel. The innovative tunneling method presented in the paper can be applied to guide the rational design and economical construction of high speed railway tunnels in loose surrounding rock under harsh geological conditions.
机译:本文主要涉及高速铁路隧道的结构设计及其突然岩石船舶突然坡度的驱动方法,同时根据复杂的地貌和地质的隧道门户网路与桥梁桥面的连接。采用防滑桩保留隧道门户附近突然斜坡的稳定性。为了消除隧道施工的风险和成本,发明了四种板凳切割方法,以满足隧道中松动岩石的安全开挖。复合纤维突突栓也用于在驱动隧道时保持工作面的稳定性。本文中提出的创新隧道方法可用于指导在苛刻地质条件下松散围岩中高速铁路隧道的合理设计和经济建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号