首页> 外文会议>International Conference on Recent Trends in Materials and Mechanical Engineering >Peak Cycle Stress Analysis of the II Type Dent on Pipeline Based on FE Calculation
【24h】

Peak Cycle Stress Analysis of the II Type Dent on Pipeline Based on FE Calculation

机译:基于FE计算的管道II型凹痕的峰循环应力分析

获取原文

摘要

Dent is one of the important factors affecting pipeline fatigue life, and it will greatly reduce the fatigue life of the pipeline in service. And the peak cycle stress on the dented pipeline is the key parameter to calculate pipeline fatigue life. For typical II type dent in the pipeline, the finite element models are established under different circumstances. A large number of the calculation results are sorted, inducted, drew. On this basis, the results are analysed by Universite and multivariate. Non-linear regression analysis was utilized to fit the results by matlab, some specific expressions of the relationship between the dented pipeline peak cycle stresses and the dent depth, diameter and thickness of pipeline, and the dent longitudinal length are obtained after much calculation and analog.
机译:凹痕是影响管道疲劳寿命的重要因素之一,它将大大降低服务管道的疲劳寿命。并且凹陷管道上的峰值循环应力是计算管道疲劳寿命的关键参数。对于管道中的典型II型凹痕,在不同情况下建立有限元模型。大量的计算结果是对,引导,绘制的。在此基础上,通过超人物和多变量分析结果。利用非线性回归分析来符合Matlab的结果,在许多计算和模拟后,获得了凹陷管道峰循环应力与凹陷峰循环应力和凹陷深度,直径和厚度之间的一些特定表达,以及凹陷纵向长度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号