首页> 外文会议>International Conference on Management Science and Intelligent Control >Concept and Research Progress of Order Scheduling Problem in Production Scheduling System
【24h】

Concept and Research Progress of Order Scheduling Problem in Production Scheduling System

机译:生产调度系统订单调度问题的概念与研究进展

获取原文

摘要

Over the past few decades, there have been a substantial number of research papers dedicated to conventional production scheduling(CPS) problems whose performance has generally been evaluated by the completion time of jobs. These research results cannot be extended to customer order scheduIing(COS) problems due to the fact that an order usually consists of more than one job. Delivery of an order is not possible until either all jobs of the order are completed or the jobs of the specified suborders are completed. Due to the difficulty of COS problems, known researches and comprehensive literatures on the issue are scarce. Aiming at promoting research in the field and clarifying the relationship between COS and CPS, this paper analyzes the concepts of order and job in CPS context and reviews the development of COS problems in four categories.
机译:在过去的几十年里,已经有大量的研究论文致力于传统的生产计划(CPS)问题,其性能通常通过就业完成时间进行评估。由于订单通常由多项工作组成的事实,这些研究结果不能扩展到客户订单调度(COS)问题。在完成订单的所有作业或完成指定的子排序的所有作业之前,无法进行订单。由于COS问题的难度,所知的研究和问题上的综合文学稀缺。旨在促进现场研究并澄清COS和CPS之间的关系,分析了CPS背景下的秩序和工作的概念,并审查了四个类别中的COS问题的发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号