首页> 美国政府科技报告 >Acquisition Portfolio Schedule Costing/Optimization Model: A Tool for Analyzing the RDT&E and Production Schedules of DoD ACAT I Systems
【24h】

Acquisition Portfolio Schedule Costing/Optimization Model: A Tool for Analyzing the RDT&E and Production Schedules of DoD ACAT I Systems

机译:采购组合计划成本核算/优化模型:分析国防部aCaT I系统的RDT&E和生产计划的工具

获取原文

摘要

IDA investigated whether the excess capacity present at military production plants can be exploited to produce more cost-effective production schedules for major acquisition programs. IDA developed a mixed-integer mathematical programming (MIP) model called the Acquisition Portfolio Scheduling Costing/Optimization Model, which can either cost or optimize the production schedules of approximately 100 Acquisition Category (ACAT) I programs over an 18-year period. The model's output also provides an estimate of what it costs the Department of Defense (DoD) to operate in its current fashion without adjusting (optimizing) the systems' production schedules. This document describes the model, its functions, and methodologies.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号