Scheduled progress rate calculation device, scheduled progress rate calculation method, and scheduled progress rate calculation program

机译:预定的进度率计算设备,预定的进度率计算方法和预定的进度率计算程序

摘要

Problem to be solved: to calculate the planned rate of progress for each month based on the planned progress rate from the scheduled monthly rate to the monthly schedule Problem to be solved: to provide a planned progress rate calculation program.To obtain the total cost of the project, based on the monthly target cost and the cumulative cost of the project, the target rate of progress for each month of the project is obtained using the cost proportional method, based on the amount of orders received and the planned progress rate Get monthly scheduled sales amounts for monthly project sales amounts.Diagram
机译:要解决的问题:根据计划的每月从预定的月度费率到月度进度问题的计划进度率计算计划的进展率:提供计划的进度率计算计划。为了获得项目的总成本,根据项目的每月目标成本和项目的累积成本,根据收到的订单数量和预订的订单数量,使用成本比例方法获得每个月的项目的目标进度税率计划的进度率为每月项目销售金额获得每月计划销售额。图表

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号