Multi-Span Closure Construction and Optimization Analysis of the Main Channel Bridge on the Left Branch of Beijiang River

机译:北江左分支主通道桥的多跨闭合施工及优化分析

获取原文

摘要

Multi stages such as side span closure, middle span closure, ten years after construction and so on are simulated with the finite element method in the main channel bridge on the left branch of Beijiang River. Many issues such as unreasonable incremental launching force in construction are found. The optimization made the vertical displacement of the main beam controlled, the secondary moment value on the top of the pier by the side bending of the anchorage and the secondary effect of pre-stressed tendons significantly reduced, and the force of anchorage more balanced. Construction sequence optimization can make the construction process more reasonable and provide a reference for the closing segment construction of the bridge.
机译:多阶段,如侧跨闭合,施工后十年等跨度封闭,诸如北江左臂主干桥中的有限元法模拟施工等。发现许多诸如建设中不合理的增量发射部队等问题。优化使主光束控制的垂直位移,通过锚固侧弯曲的码头顶部的次级值和预应力肌腱的二次效果显着降低,并且锚固力更加平衡。施工序列优化可以使施工过程更合理,并为桥的闭合段结构提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号