Identification of Success Factors in Minimizing Delays on Construction Projects in IAU-Shoushtar-Iran

机译:确定IAU-Shoushtar-Iran在最大限度地减少建筑项目延迟的成功因素的识别

获取原文

摘要

Delays in construction projects are usually inevitable, and most projects are not completed on time. The scope of this study was to find out the factors that are responsible for minimizing delays on construction projects in Islamic Azad University (IAU) Shoushtar Branch in Iran. The overall ranking of most vital factors causing delay and how they cause it, as well as effective methods of minimizing delay on construction projects was obtained by the mean rank score. It was found that the use of experienced contractors and subcontractors, financial difficulties by contractor and change orders by employer during construction were some of the factors responsible for delay. However, time and cost overrun were seen to be the major factors causing delay. The result showed that the use of experienced contractors and subcontractors, accurate initial cost estimates and clear objective and scope were effective methods of minimizing delay on construction projects. The results obtained here, though peculiar to a certain area can be adopted for other case studies in which similar problems are encountered.
机译:建设项目的延误通常是不可避免的,大多数项目都没有按时完成。本研究的范围是找出负责最大限度地减少伊朗伊斯兰·阿扎德大学(IAU)Shoushtar分公司建设项目延误的因素。大多数重要因素的整体排名导致延迟以及它们如何引起它,以及最小化建设项目延迟的有效方法是通过平均等级得分获得。有人发现,经验丰富的承包商和分包商,承包商的财务困难和雇主在建设期间改变订单是负责延误的一些因素。然而,时间和成本超支被认为是导致延迟的主要因素。结果表明,使用经验丰富的承包商和分包商,准确的初始成本估算和清晰的目标和范围是最大限度地减少建设项目延迟的有效方法。这里获得的结果,但可以采用特定于某个区域的特定用于遇到类似问题的其他案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号