首页> 外文会议>International Conference on Civil Engineering and Transportation >Research on Capacity Coordination of Loading and Unloading Wagon Flow on Heavy-Haul Railway
【24h】

Research on Capacity Coordination of Loading and Unloading Wagon Flow on Heavy-Haul Railway

机译:重载铁路装卸马车的能力协调研究

获取原文

摘要

This paper has carried out some researches on organization method of wagon flow of coal transportation corridor to meet the demand of heavy-haul railway. To improve the capacity of a collecting and distributing system, the optimal problem is described as: coordination of loading capacity and unloading capacity to determine the wagon flow. Based on the analysis of the capacity of loading end and unloading end of Daqin Railway, the model with the minimization of the transportation price and the idle cost of the equipment and the maximization of the total loading and unloading wagons of the system is constructed. Then the paper transformed this multi-objective programming into a transportation problem by using main objective method, so that the model can be solved easily. Finally, by solving of the problem respectively on Daqin Railway, the model is proved to use on capacity coordination of loading and unloading stations on heavy-haul railway.
机译:本文对煤炭运输走廊的无盖货车组织方法进行了一些研究,以满足重型铁路的需求。为了提高收集和分配系统的能力,最佳问题被描述为:加载容量和卸载能力的协调,以确定马车流量。基于分析大秦铁路装载端和卸载端的容量,构建了具有最小化运输价格的模型和设备的怠速成本及系统的总装载和卸载车辆的最大化。然后,通过使用主要的目标方法将该多目标编程转化为运输问题,因此可以轻松解决模型。最后,通过在大秦铁路上分别解决问题,该模型被证明用于在重物铁路上装载和卸载站的能力协调。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号