首页> 外文会议>International Conference on Civil Engineering and Transportation >Analyzing Risks in Public Relationships with Different Stakeholders in an EPC Project Overseas from the Aspect of Contractors
【24h】

Analyzing Risks in Public Relationships with Different Stakeholders in an EPC Project Overseas from the Aspect of Contractors

机译:从承包商方面分析了与海外EPC项目中不同利益相关者的公共关系风险

获取原文

摘要

The aim of this research is to investigate the risks in public relationships with different stakeholders in an EPC project overseas from the aspect of contractors. All types of relationships and the relationship risks lying in them are listed, risk responses are recommended correspondingly by putting forwards several major methods. Specifically, risks in contractors and owners are analyzed in this paper. The data collection instrument was an item sequence scored by 11 professors in Tianjin University who had comprehensive understandings about the stakeholders' relationships in an EPC project abroad. Ways to response to these risks are also recommended by these professors. Chinese corporations undertaking the EPC projects overseas may utilize these findings to identify the risks in public relationships and adopt proper measures to avoid these risks to ensure a successful EPC project overseas.
机译:本研究的目的是调查与承包商的方面的EPC项目中与不同利益相关者的公共关系的风险。列出了所有类型的关系和符合它们的关系风险,通过提出几种主要方法,相应地建议风险响应。具体而言,本文分析了承包商和业主的风险。数据收集仪是天津大学11名教授的项目序列,他们对国外EPC项目中的利益相关者的关系全面了解。这些教授也建议了对这些风险的回应方式。在海外开展EPC项目的中国企业可以利用这些调查结果来确定公共关系中的风险,并采取适当措施来避免这些风险,以确保海外成功的EPC项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号