首页> 外文期刊>Journal of Management in Engineering >Relationships among Risk Management, Partnering, and Contractor Capability in International EPC Project Delivery
【24h】

Relationships among Risk Management, Partnering, and Contractor Capability in International EPC Project Delivery

机译:国际EPC项目交付中的风险管理,合作伙伴和承包商能力之间的关系

获取原文
获取原文并翻译 | 示例
           

摘要

Engineering-Procurement-Construction (EPC) method has become commonly adopted in international construction markets, in which contractors bear enormous risks. Previous studies suggest the need to improve contractors' risk management by partnering with project participants and enhancing their organizational capability. Nevertheless, limited research has systematically and quantitatively addressed the causal relationships among them. This study quantifies the relationships among these themes via the development and validation of a conceptual mediation model. With supporting data from Chinese contractors, this research outlines the statuses on contractors' risk management, application of partnering, and their organizational capability. Path analysis validates that partnering not only effectively facilitates risk management via promotion of contractor capability but also directly enhances risk management. Canonical correlation analyses further reveal the different degrees to which partnering critical success factors (CSFs), contractor capability indicators, and risk management processes are associated. The previously mentioned results contribute to both theory and practice by building interdisciplinary linkages among risk management, partnering, and contractor capability in international EPC project delivery. An in-depth understanding of these cause-effect relationships will allow multiorganizational dynamic risk management research to become state-of-the-art, and will aid EPC contractors in appropriately integrating both intraorganizational and interorganizational resources to manage project risks and achieve superior performance in international EPC projects.
机译:工程采购建设(EPC)方法已成为国际建筑市场中普遍采用的方法,承包商承担着巨大的风险。先前的研究表明,需要通过与项目参与者合作并增强其组织能力来改善承包商的风险管理。然而,有限的研究已经系统地和定量地解决了它们之间的因果关系。本研究通过概念调解模型的开发和验证来量化这些主题之间的关系。借助中国承包商的支持数据,本研究概述了承包商风险管理,合作伙伴的应用及其组织能力的状况。路径分析验证了合作伙伴关系不仅可以通过提高承包商的能力有效地促进风险管理,而且可以直接增强风险管理。典型的相关分析进一步揭示了伙伴关系的关键成功因素(CSF),承包商能力指标和风险管理过程的不同程度。前面提到的结果通过在国际EPC项目交付中建立风险管理,合作伙伴和承包商能力之间的跨学科联系,为理论和实践做出了贡献。对这些因果关系的深入了解将使多组织动态风险管理研究成为最新技术,并将帮助EPC承包商适当地整合组织内和组织间资源,以管理项目风险并在项目管理中取得卓越绩效。国际EPC项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号