首页> 外文会议>International Conference on Civil Engineering,Architecture and Building Materials >Optimization Analysis of Position and the Shape of the Pre-setting Hole on Cast-in-situ Box Girder Roof
【24h】

Optimization Analysis of Position and the Shape of the Pre-setting Hole on Cast-in-situ Box Girder Roof

机译:铸造箱梁屋顶上设定孔的位置与形状的优化分析

获取原文

摘要

By analyzing concrete crack on the roof caused by the pre-setting hole during the construction process of the pre-stressed concrete cast-in-situ box girder bridge, this paper, which uses segment integral analysis method by ANSYS finite element program, primarily takes into account different hole position and shapes. The result shows that different position and the shape of the pre-setting hole can be seemed as decisive factors in influencing stress near the hole. It can be concluded as: the pre-setting hole should set as far as possible from pre-stressed passageway and the pre-stressed rebar first, then the shapes of hole should use circular or take corner cut polygon. Ultimately, under the premise of normal used construction, it is considerable to strive as much as possible in narrowing down the dimension of the pre-setting hole.
机译:通过在预应力的混凝土铸造箱梁梁桥梁施工过程中分析由预定孔引起的屋顶上的混凝土裂缝,本文使用ANSYS有限元节目的段积分分析方法,主要需要考虑到不同的孔位置和形状。结果表明,在影响孔附近的压力方面,可以看起来不同的位置和形状似乎是决定性因素。可以得出结论:预先设定孔应尽可能从预应力的通道和先进的钢筋首先设定,那么孔的形状应该使用圆形或取角切割多边形。最终,在正常使用的建筑的前提下,在缩小预设孔的尺寸时,尽可能多地争取尽可能多。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号