首页> 外文会议>IFAC Conference on Management and Control of Production and Logistics >Preparation of Papers for IFAC Conferences Symposia: Method for the identification of point in time for changes in production networks
【24h】

Preparation of Papers for IFAC Conferences Symposia: Method for the identification of point in time for changes in production networks

机译:IFAC会议与专题讨论的纸张:用于识别生产网络变化时间点的方法

获取原文

摘要

By focusing on core competencies and the utilization of international location advantages such as access to low-wage labor and local sales markets, global production networks are becoming increasingly complex. Additionally, turbulent times with great uncertainty forces globally acting enterprises to adapt their production networks. Therefore, it is crucial to determine the right point in time for change and also to identify the beneficial production network alternatives. In other words, globally acting enterprises have to answer the two questions of what to change and when to change. The presented method describes an approach for the strategic planning of global changeable production networks, based on future scenarios and a multi-objective optimization to identify the most favorable network configuration during the planning horizon. The multi-objective optimization is modeled as a mixed-integer MODM problem (multi-objective decision making) including seven criteria i.e. costs, delivery time, quality, flexibility, customer proximity, coordination and plant qualification.
机译:通过专注于核心竞争力和利用国际优势,例如获得低工资劳动和当地销售市场,全球生产网络变得越来越复杂。此外,湍流时间具有巨大的不确定性迫使全球性的企业,以适应其生产网络。因此,确定改变的正确时间点以及识别有益生产网络替代方案至关重要。换句话说,全球代理企业必须回答改变和何时改变的两个问题。本方法描述了一种基于未来情景和多目标优化的全球变化生产网络战略规划的方法,以确定规划地平线期间最有利的网络配置。多目标优化建模为混合整数MODM问题(多目标决策),包括七个标准即成本,交货时间,质量,灵活性,客户邻近,协调和工厂资格。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号