BRIDGE THE SAN JOAQUIN RIVER - ONE CHALLENGE IN 37 MILE PIPELINE

机译:桥梁三何奎河 - 37英里管道的一个挑战

获取原文

摘要

South San Joaquin Irrigation District (SSJID) was faced with a reduced demand for irrigation water while the nearby cities were experiencing increased domestic demand and deteriorating ground water supplies. The District made the decision to supply potable water to the local communities. The project, which is now in service, will supply up to 60 mgd of treated water to the communities of Escalon, Manteca, Lathrop, and Tracy located in the Central Valley of California. The drinking water is treated in a new membrane filtration plant located adjacent to SSJID's Woodard Reservoir. The water is delivered through 37 miles of pipe and five turnouts. Each turnout has an at-grade steel reservoir and booster pumps. The pipeline design and construction included, in addition to the pipe, 10 railroad crossings, two interstate crossings, two microtunneled levee crossings, and a 641-foot-long four span pre-engineered steel truss bridge over the San Joaquin River illustrated in Figure 1. During the design and construction of the San Joaquin River Bridge Crossing the following lessons were learned.
机译:南圣华金灌区(SSJID)面临着对灌溉用水需求减少,而附近的城市正在经历增加的国内需求和不断恶化的地下水源。区发来提供饮用水对当地社区的决定。这个项目,这是现在在服务,将提供高达60万加仑的处理水到位于加州中央谷ESCALON,曼特卡,莱思罗普,和麦蒂的社区。饮用水在毗邻SSJID的伍达德水库新的膜过滤装置处理。水通过37英里管五组道岔交付。各道岔具有在钢级储存器和增压泵。管道设计和施工包括,除了配管,10个铁路道口中,两个州际交叉,二microtunneled大堤道口,和一个预设计641英尺长的4跨度钢桁架桥在圣华金河在图1所示。在圣华金河大桥隧道的设计和施工以下获得经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号